top of page

FLS Library

FLS Group Logo with Tagline _ Color_edited.png

BATU HIJAU CCPP-1 PROJECT

Updated: Jul 23, 2025


Project Name: BATU HIJAU CCPP-1 PROJECT

Client /EPC: Jurong Engineering

Cargo: GAS TURBINE GENERATOR SYSTEM

EX NRK: 73 PKGS / 327,640.00 KGS / 1,447.836 CBM (Heaviest: 90MT)

EX HAM: 80 PKGS / 370,092.76 KGS / 1,560.838 CBM (Heaviest: 86MT)

EX HAY: 26 PKGS / 81,746.00 KGS / 1,139.633 CBM

Shipper: Siemens Energy AB

Destination: Benete Bay


Scope:

  • Loading from Ex Norrkoping, Hamburg & Haydarpasa and discharge at Benete Bay






Back
bottom of page