top of page

FLS Library

FLS Group Logo with Tagline _ Color_edited.png

Cameron Project

Updated: Jul 23, 2025


Project Name: Cameron LNG Liquefaction Project

Client: Heurtey Petrochem

Volume: Appr. 10,000 cbm break bulk cargo, incl. items with 8.5 meters height, over 30 meters length and up to 190 metric tons heavy

Commodity: Waste Heat Recovery Units

Origin: Sattahip, Thailand

Destination: Houston, USA

Scope:

  • Arranging for road surveys and road permits from Department of Highways

  • Road transport from the fabrication shop in Khao Hin Sorn to Sattahip port

  • Signboard and cable lifting, trimming of trees

  • Port storage and handling

  • Export customs clearance

  • FAS delivery and loading supervision






Back
bottom of page