PELICAN POINT POWER PLANT PROJECT 1/2
- khuongnguyen8
- Sep 25, 2025
- 1 min read
Volume: 28 packages, 3,779 cbm, 341. MT
Origin: Dung Quat, Vietnam
Port of Discharge: Adelaide, Australia
Final Destination: Pelican Point Combined Cycle Power Plant
Scope:
•Apply for a special oversize transportation permit
•Transporting cargo from the work-shop to the port of loading
•Two specialized electric power teams providing escort services throughout the transportation process to ensure safety and operational efficiency
•Third party survey and inspection of the cargo
•Coordination and strategic placement of lifting beams to ensure alignment with the appropriate Working Load Limit (WLL) for safe and efficient operations.
•Ocean freight from Dung Quat to port of discharge Adelaide
•Loading onto vessel incl appropriate cargo stow arrangements. Cargo hold preparation for loading, including layout of dunnage by FLS owned stevedores
•Lashing and securing
•FLS Port Captains supervised the whole trucking and loading operation