top of page

FLS Library

khuongnguyen8khuongnguyen8

khuongnguyen8

Editor
Admin
More actions

Profile

Join date: Sep 24, 2025

Posts (4)

Sep 25, 2025 ∙ 1 min
PJT_LOADING OF HEAVY STONES_092525
Project name: Greater Changhua Commodity: Heavy stones Origin: Norway Destination: Taiwan Scope: •Vectura/FLS was contracted to charter a dedicated vessel including the loadout option in Norway. •Due to various restrictions, the loaded was done with heavy duly orange-peel grabs. •Vectura did also the project management including risk assessment.

45
0
Sep 25, 2025 ∙ 1 min
PJT_PELICAN POINT POWER PLANT PROJECT 2/2_092525
Volume: 28 packages, 3,779 cbm, 341. MT Origin: Dung Quat, Vietnam Port of Discharge: Adelaide, Australia FinalDestination: Pelican Point Combined Cycle Power Plant Challenges: •Complexity due to the cargo’s size with max length 15.46M, width 9.55M, height 5.30M •The nearest BBK terminal at the POD to the job site is not workable •Investigate suitable direction to the job site, adjust construction to fit the cargo during transportation --> We got involved in the discussions at a very early...

55
0
Sep 24, 2025 ∙ 1 min
PJT_PELICAN POINT POWER PLANT PROJECT 1/2_011626
Volume: 28 packages, 3,779 cbm, 341. MT Origin: Dung Quat, Vietnam Port of Discharge: Adelaide, Australia Final Destination: Pelican Point Combined Cycle Power Plant Scope: •Apply for a special oversize transportation permit •Transporting cargo from the work-shop to the port of loading •Two specialized electric power teams providing escort services throughout the transportation process to ensure safety and operational efficiency •Third party survey and inspection of the cargo •Coordination...

51
0
bottom of page