Sep 25, 2025 ∙ 1 min
LOADING OF HEAVY STONES
Project name: Greater Changhua Commodity: Heavy stones Origin: Norway Destination: Taiwan Scope: •Vectura/FLS was contracted to...
14
0
Sep 25, 2025 ∙ 1 min
PELICAN POINT POWER PLANT PROJECT 2/2
Volume: 28 packages, 3,779 cbm, 341. MT Origin: Dung Quat, Vietnam Port of Discharge: Adelaide, Australia FinalDestination: Pelican Point Combined Cycle Power Plant Challenges: •Complexity due to the cargo’s size with max length 15.46M, width 9.55M, height 5.30M •The nearest BBK terminal at the POD to the job site is not workable •Investigate suitable direction to the job site, adjust construction to fit the cargo during transportation --> We got involved in the discussions at a very early...
24
0
Sep 24, 2025 ∙ 1 min
PELICAN POINT POWER PLANT PROJECT 1/2
Volume: 28 packages, 3,779 cbm, 341. MT Origin: Dung Quat, Vietnam Port of Discharge: Adelaide, Australia...
16